Sunday, October 18, 2015

LCVP Storage

Every year there are many things we have to do to prepare for the weather.  Pulling the LCVPs out of the water is a big job.  Our deuce 1/2 has had several modifications to be able to do this.  We have also had many people modify the trailer to make loading the LCVP easier.  Below are pictures of how we load the LCVP.


John Engstrom drives the deuce.


Andrew Schade provides moral support.




Scott Anderson and Patrick Shubel approach in the LCVP cautiously to not hit the trailer or deuce while driving up.  We had some technical difficulties with the trailer and the low water level.  We plan to try again down at Evansville's Riverfront Plaza.


No comments:

Post a Comment