The ship was moved yesterday, Feb 17. It took most of the day. They used two tugs. Some of the new paint on the sides was scuffed up. The yard will touch that up. The numbers need to be repainted on the ship. The prop guards need to be rebuilt. The pontoon rail has only been cut on one side of the ship. The other side must be done and then that area repainted.
The yard guys are now working 24 hours a day. We still hope to get underway the 22nd. The new location is pretty remote and spartan. Much worse than by the dry dock. Ugh. The chemist has to retest every single tank again since the ship was moved. Work continues all over the ship. More later.